
01. Mike assembling the dolly

02. The finished dolly on tracks

03. Mike with finished dolly

04. Mike making dolly to run along an aluminium ladder

05. Upside down dolly with wooden ladder section

06. Fixing side guides with assistant Neil

08. The completed dolly with tripod and camera